Our Services

Three Ways We Fund Your Mission

Paired state and federal energy grants can cover up to 95% of HVAC, solar, and efficiency projects, including EV charger installation on qualifying sites, and the application is free. FEMA (NSGP) and state security grants can fund up to $400,000 in security upgrades for non-profits, schools, and places of worship. And our boutique grant practice covers everything in between.

Our Biggest Opportunity

Up to 95% of an HVAC or solar project covered, and applying costs nothing.

Energy Grants: HVAC, Solar, EV Charging & Efficiency Upgrades

This is the largest funding opportunity we help nonprofits capture. Used together, a Maryland state energy grant and a federal energy grant can cover up to 95% of the cost of upgrading your building’s energy systems, from HVAC replacement and controls to solar and efficiency retrofits. For qualifying projects the same work extends to EV charging: MEA’s Community EVSE grant funds Level 2 and DC fast chargers, including the electrical upgrades, conduit, trenching, and installation behind them, for workplaces, parking areas, multi-family housing, and fleet vehicles such as electric school buses. The application process is free, and we build the applications as one project so the scopes, budgets, and documentation line up.

  • Up to 95% of Project Costs Covered
  • HVAC, Solar & Efficiency Scopes
  • EV Chargers (Level 2 & DC Fast)
  • State + Federal Applications Paired
  • Free Energy Application Support

FEMA (NSGP) & State Security Grants

FEMA (NSGP) is the one federal security program created specifically for nonprofits at risk of a terrorist attack, and matched state security grants run alongside it. Together they can provide up to $400,000 in federal and state funding for security upgrades at non-profits, schools, and places of worship. We handle eligibility review, vulnerability assessment coordination, and both the federal and state applications from start to finish.

  • Up to $400,000 in Federal and State Funding
  • 501(c)(3) Eligibility Review
  • Vulnerability Assessment Coordination
  • Investment Justification
  • State Administrative Agency Submission

Boutique Grants

The smaller, mission-specific programs the big grant shops overlook. If your organization runs a food pantry, serves people with special needs, provides mental health or counseling services, mentors youth at risk, or cares for seniors, there are funders built for exactly that work. These awards move faster, stack well alongside your energy and security funding, and reward an organization that can tell its program story precisely. We match your mission to the programs most likely to say yes, then write those applications.

  • Food Insecurity & Hunger Relief
  • Special Needs & Disability Services
  • Mental Health & Counseling
  • Youth at Risk & Senior Services

Post-Award Grant Management

Winning the grant is just the beginning. We provide comprehensive post-award management to ensure compliance, timely reporting, and successful project close-out.

  • Financial Tracking and Reporting
  • Compliance Monitoring
  • Performance Measurement
  • Grant Close-Out Support
Inside the Energy Grant

How Maryland Scores Energy Grant Applications

The Maryland Energy Administration (MEA) Commercial & Community Buildings program ranks every application out of 100 points against others in the same sector. Sixty points come from numbers in MEA's required calculator, so the strength of the audit and the budget decides most of the outcome.

FY27 applications are due December 9, 2026. Audits and contractor quotes take two to three weeks, so the time to start is now.

The 100-point rubric

  • 30

    Greenhouse gas emissions reduced

    Lifetime tons of CO2e cut by the measures, from MEA’s required calculator

  • 15

    Cost effectiveness

    MEA dollars requested per ton of CO2e reduced. Lower is better

  • 15

    Energy use intensity savings

    How far the building’s energy use per square foot drops after the project

  • 10

    Non-profit building

    IRS tax-exempt letter on file

  • 10

    Equity focus

    Building sits in an overburdened census tract (MDEnviroScreen)

  • 10

    BEPS benchmarking

    Buildings not covered by BEPS receive the full 10 automatically

  • 10

    Justification and community impact

    Two short written responses, 5 points each

Several programs, one building

  • Efficiency & electrification

    Heat pumps, HVAC, water heating, controls, and envelope upgrades at existing buildings

    $50,000 to $2.5M per building, up to 65% of cost

  • Non-profit solar

    Rooftop, ground-mount, or parking-canopy solar owned by the non-profit

    $3,000 to $3,500 per kW, up to $1M and 65% of cost, plus the 30% federal credit

  • Community EVSE grant

    EV chargers in the parking lot, through a separate MEA application

    We can help install, own, and operate chargers for the site

  • Utility rebates & federal credit

    EmPOWER rebates on efficiency, and a 30% elective-pay credit on solar and batteries

    Layered on top of each project above

Efficiency and solar go in one MEA application per building. Each program is its own funded project, all prepared from the same audit and the same set of utility bills.

How We Build Your Application

Three Things We Do Before You Apply, at No Cost

For Maryland energy grants, the audit, the quotes, and the application carry no cost to your organization, and you keep the full award.

Free

Energy audit by a licensed PE

A site visit and bill analysis that produces the baseline, the measure list, and the savings documentation MEA requires for every number in the calculator.

Free

Installer quotes

Real contractor pricing for solar and efficiency measures, so the budget MEA scores is the budget the project will actually cost.

Free

The application itself

Calculator, budget, timeline, narratives, IRS letter, overburdened-tract check, and owner consent, submitted through MEA’s portal with your authorized signer.

After the Award

The grant is the start. We stack the rest.

Example, non-profit solar: a $300,000 system draws a $195,000 MEA grant (65%) and a $90,000 federal credit (30%) paid to the non-profit as a direct payment, leaving an owner share of $15,000 (5%). Efficiency projects stack the grant with utility rebates instead.

Utility rebates

EmPOWER programs at BGE, Pepco, Potomac Edison, and SMECO. We file them and list them in the MEA budget.

Federal tax credit

30% on solar and batteries through elective pay. We handle IRS registration with your accountant and plan around the 2027 in-service deadline.

Reimbursement and reporting

MEA pays after work is done. We prepare every reimbursement request and progress report for the life of the grant agreement.

Costs incurred before the grant agreement is signed are not reimbursed. Your organization fronts costs between invoices and MEA payment, and we help arrange bridge financing where needed.

Your timeline to the December 9 deadline

Week 1

Intro call and bills

You share 12 months of utility bills and your IRS letter. We check eligibility and census tract the same day.

Weeks 2 to 3

Audit and quotes

Site visit, measure list, savings documentation, and installer pricing.

Weeks 4 to 6

Application and approval

We draft everything. Your board or officer reviews and the authorized signer signs.

Submission

Submit, then build

Awards are expected in spring 2027. Construction starts after the grant agreement.

What we need from you: 12 months of utility bills, your IRS determination letter, an officer who can sign, and the property owner's consent if the building is leased.

Energy Grants · EV Charging

EV Charging Station Installation Support

Electric vehicle charging is now an eligible component of a building energy project. That means the chargers, the electrical work behind them, and the install can ride on the same state and federal energy grant application as your HVAC, solar, or efficiency upgrades. We build both into one project so the scopes, budgets, and documentation line up instead of competing.

Level 2 & DC Fast Chargers

We right-size the hardware for your traffic: Level 2 pedestals for staff and visitor parking, DC fast chargers where turnover or fleet turnaround demands it.

Electrical Infrastructure

The work behind the chargers is usually the real cost. Panel and service upgrades, step-down transformers, conduit runs, trenching, and pavement restoration all get built into the grant scope.

Site Design & Permitting

Stall layout, ADA accessibility, signage, utility interconnection requests, and local permits. We coordinate these with your contractor so the grant budget reflects the full install.

Fleet & School Bus Charging

Depot charging for electric school buses, vans, and service vehicles, including load management so a fleet can charge overnight without rebuilding your entire electrical service.

What We Handle For You

From the first charger count to the final commissioning report, the EV scope is documented and submitted as part of your energy application.

MEA Community EVSE grant applications
Charger count and site plan documentation
Contractor quotes and scope review
Utility coordination and interconnection
Commissioning and warranty paperwork
Usage reporting and network setup
Workplaces & officesParking lots & garagesMulti-family housingSchool & municipal fleetsHouses of worshipNon-profit campuses

Find Out What Your Building Qualifies For

The consultation is free, with no obligation. We will tell you which energy and security programs fit your organization and what the project would actually cost you.